{"id":305,"date":"2026-04-20T07:32:28","date_gmt":"2026-04-20T07:32:28","guid":{"rendered":"https:\/\/catelecomuk.com\/blog\/?p=305"},"modified":"2026-04-22T07:58:04","modified_gmt":"2026-04-22T07:58:04","slug":"how-uk-telecom-infrastructure-companies-manage-streetworks-permits-compliance","status":"publish","type":"post","link":"https:\/\/catelecomuk.com\/blog\/how-uk-telecom-infrastructure-companies-manage-streetworks-permits-compliance\/","title":{"rendered":"How UK Telecom Infrastructure Companies Manage Streetworks Permits &#038; Compliance"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">When people think about the work of <a href=\"https:\/\/catelecomuk.com\/\">telecommunications infrastructure companies in the UK<\/a>, they typically picture engineers in the field laying fibre, building chambers, or installing new ducting. What is less visible \u2014 but equally important \u2014 is the complex web of permits, regulations, and compliance obligations that must be managed before, during, and after every single works programme. Getting this right is not optional. It is a legal requirement, a professional standard, and a direct measure of a company&#8217;s ability to deliver projects that work for clients, communities, and the highway authorities that govern public roads across the UK.<\/span><\/p>\n<h1><span style=\"font-weight: 400;\">Why Streetworks Regulation Exists<\/span><\/h1>\n<p><span style=\"font-weight: 400;\">Any time a contractor needs to break up a road, pavement, or verge to carry out telecoms works, they are legally required to operate within a structured regulatory framework. In the UK, this framework is built primarily on the <\/span><b>New Roads and Street Works Act 1991 (NRSWA)<\/b><span style=\"font-weight: 400;\">, which sets out the rights and duties of utility companies and contractors working in the public highway. The <\/span><b>Traffic Management Act 2004<\/b><span style=\"font-weight: 400;\"> built on this further, introducing tighter controls on the duration of works and enabling lane rental schemes in high-congestion areas.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">These laws exist for good reason. Uncoordinated, poorly managed streetworks cause disruption to traffic, pose risks to pedestrians, and can damage existing underground infrastructure. Robust permitting and compliance processes are the mechanism through which telecommunications infrastructure companies in the UK demonstrate that their operations are safe, organised, and considerate of the communities they work in.<\/span><\/p>\n<h2><span style=\"font-weight: 400;\">The Permit Process: From Application to Sign-Off<\/span><\/h2>\n<p><span style=\"font-weight: 400;\">In England, the permitting process is managed through <\/span><b>Street Manager<\/b><span style=\"font-weight: 400;\">, the government&#8217;s digital platform for coordinating all works on the public highway. Wales, Scotland, and Northern Ireland operate under similar but distinct regulatory systems. For any given telecoms excavation project, the permit journey typically follows this sequence:<\/span><\/p>\n<p><b>Notice and Application<\/b><span style=\"font-weight: 400;\"> Before work can begin, the contractor must submit a permit application to the relevant highway authority. This details the proposed location, the nature and scope of the works, the expected duration, and the traffic management arrangements that will be put in place. Major works require longer advance notice periods \u2014 sometimes several weeks \u2014 while minor works allow for a shorter lead time, though accuracy and completeness are still essential.<\/span><\/p>\n<p><b>Coordination<\/b><span style=\"font-weight: 400;\"> Highway authorities use Street Manager to identify potential clashes \u2013 where multiple utilities or contractors plan to work in the same location around the same time. Telecommunications infrastructure companies in the UK must engage actively with this coordination process. Failing to respond to clash notifications can result in permit refusal, enforced delays, and strained relationships with local authorities.<\/span><\/p>\n<p><b>Works Execution and Permit Management<\/b><span style=\"font-weight: 400;\"> Once on site, the contractor is responsible for keeping the permit information current. If works overrun their agreed duration, or if the scope changes, permit variations must be submitted promptly. Failing to manage this in real time can result in Fixed Penalty Notices (FPNs), which go on the contractor&#8217;s compliance record and affect future permit applications.<\/span><\/p>\n<p><b>Reinstatement and Inspection<\/b><span style=\"font-weight: 400;\"> When excavation works are complete, the highway must be reinstated to the standard defined by the <\/span><b>Specification for the Reinstatement of Openings in Highways (SROH)<\/b><span style=\"font-weight: 400;\">. Highway authorities conduct both immediate and follow-up inspections. Any defective reinstatement must be remedied within set timeframes, and persistent failures can trigger formal intervention or financial penalties.<\/span><\/p>\n<h2><span style=\"font-weight: 400;\">Compliance in Practice: What It Really Involves<\/span><\/h2>\n<p><span style=\"font-weight: 400;\">Securing the permit is only the beginning. Compliance for telecommunications infrastructure companies in the UK is an ongoing obligation that touches every aspect of how site works are planned and delivered.<\/span><\/p>\n<p><b>Operative Qualifications:<\/b><span style=\"font-weight: 400;\"> All operatives working on streetworks must hold valid NRSWA qualifications appropriate to their role \u2014 whether that covers signing, lighting, and guarding or the excavation and reinstatement of different categories of highway surface. Keeping a full workforce trained, certificated, and up to date is a significant operational responsibility.<\/span><\/p>\n<p><b>Traffic Management<\/b><span style=\"font-weight: 400;\"> Every streetworks site must be set up in accordance with the <\/span><b>Safety at Street Works and Road Works Code of Practice \u2013 commonly<\/b><span style=\"font-weight: 400;\">\u00a0known as Chapter 8. This specifies the exact requirements for coning, signing, barriers, and lighting depending on the road type and speed limit. Getting traffic management wrong is both a safety risk and a compliance failure.<\/span><\/p>\n<p><b>Section 81 Obligations<\/b><span style=\"font-weight: 400;\"> Under Section 81 of NRSWA, <a href=\"https:\/\/catelecomuk.com\/\">telecommunications infrastructure companies UK<\/a> have a legal duty to ensure their apparatus does not create danger or obstruction in the highway. This applies to both planned maintenance and emergency situations \u2014 a sudden duct failure, an accidental cable strike, or an urgent blockage resolution \u2014 where work must begin rapidly but still be carried out within the regulatory framework.<\/span><\/p>\n<p><b>Lane Rental Schemes<\/b><span style=\"font-weight: 400;\"> In high-demand locations, particularly across London, lane rental charges apply for every day a contractor occupies road space. This creates a direct financial incentive for efficient project execution. Companies that plan well, mobilise quickly, and complete works within their permitted timeframes consistently outperform those that don&#8217;t \u2013 both financially and reputationally.<\/span><\/p>\n<h2><span style=\"font-weight: 400;\">Why an In-House Permits and SHEQ Team Makes the Difference<\/span><\/h2>\n<p><span style=\"font-weight: 400;\">For telecommunications infrastructure companies UK working across multiple projects and local authority areas simultaneously, having a dedicated in-house permits and health, safety, environment, and quality (SHEQ) team is a considerable operational advantage. It means permit applications can be submitted and managed without delay, coordination responses are handled promptly, and compliance obligations are embedded into day-to-day site operations rather than bolted on at the end.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">This matters enormously for time-sensitive works. Emergency Section 81s, planned diversionary programmes, and reactive blockage responses all demand a fast, well-organised permitting response. When that capability sits in-house, projects get off the ground faster, clients are better served, and compliance standards are maintained consistently.<\/span><\/p>\n<h2><span style=\"font-weight: 400;\">Why It Matters for Clients and the Industry<\/span><\/h2>\n<p><span style=\"font-weight: 400;\">A telecommunications infrastructure company&#8217;s compliance track record is a genuine mark of quality. Highway authorities monitor contractor performance closely \u2013 tracking FPN history, reinstatement defect rates, and permit overruns. Companies that consistently perform well build stronger relationships with local authorities, experience fewer project delays, and carry a competitive advantage when bidding for new programmes.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">For clients \u2013 whether network operators, local authorities, or major construction programmes \u2013 working with a contractor that manages streetworks permits and compliance to a high standard reduces risk, protects programme timelines, and ensures that works are delivered without the regulatory complications that can derail even the best-planned projects.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">In the end, streetworks compliance is not just a regulatory duty. For telecommunications infrastructure companies UK, it is a reflection of professionalism, operational capability, and a genuine commitment to the communities in which they work.<\/span><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>When people think about the work of telecommunications infrastructure companies in the UK, they typically picture engineers in the field laying fibre, building chambers, or installing new ducting. What is less visible \u2014 but equally important \u2014 is the complex web of permits, regulations, and compliance obligations that must be managed before, during, and after [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":306,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-305","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Streetworks Permits &amp; Compliance | CA Telecom UK<\/title>\n<meta name=\"description\" content=\"Learn how UK telecom companies handle streetworks permits, NRSWA rules &amp; compliance to keep every network project safe, legal &amp; on time.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/catelecomuk.com\/blog\/how-uk-telecom-infrastructure-companies-manage-streetworks-permits-compliance\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Streetworks Permits &amp; Compliance | CA Telecom UK\" \/>\n<meta property=\"og:description\" content=\"Learn how UK telecom companies handle streetworks permits, NRSWA rules &amp; compliance to keep every network project safe, legal &amp; on time.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/catelecomuk.com\/blog\/how-uk-telecom-infrastructure-companies-manage-streetworks-permits-compliance\/\" \/>\n<meta property=\"og:site_name\" content=\"catelecomuk\" \/>\n<meta property=\"article:published_time\" content=\"2026-04-20T07:32:28+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-22T07:58:04+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/catelecomuk.com\/blog\/wp-content\/uploads\/2026\/04\/CATELECOM-BLOG--1024x683.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"683\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"catelecomuk\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"catelecomuk\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/catelecomuk.com\\\/blog\\\/how-uk-telecom-infrastructure-companies-manage-streetworks-permits-compliance\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/catelecomuk.com\\\/blog\\\/how-uk-telecom-infrastructure-companies-manage-streetworks-permits-compliance\\\/\"},\"author\":{\"name\":\"catelecomuk\",\"@id\":\"https:\\\/\\\/catelecomuk.com\\\/blog\\\/#\\\/schema\\\/person\\\/0b87c2feea098db2e198e89ab9edf88c\"},\"headline\":\"How UK Telecom Infrastructure Companies Manage Streetworks Permits &#038; Compliance\",\"datePublished\":\"2026-04-20T07:32:28+00:00\",\"dateModified\":\"2026-04-22T07:58:04+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/catelecomuk.com\\\/blog\\\/how-uk-telecom-infrastructure-companies-manage-streetworks-permits-compliance\\\/\"},\"wordCount\":1081,\"commentCount\":0,\"image\":{\"@id\":\"https:\\\/\\\/catelecomuk.com\\\/blog\\\/how-uk-telecom-infrastructure-companies-manage-streetworks-permits-compliance\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/catelecomuk.com\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/CATELECOM-BLOG-.png\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/catelecomuk.com\\\/blog\\\/how-uk-telecom-infrastructure-companies-manage-streetworks-permits-compliance\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/catelecomuk.com\\\/blog\\\/how-uk-telecom-infrastructure-companies-manage-streetworks-permits-compliance\\\/\",\"url\":\"https:\\\/\\\/catelecomuk.com\\\/blog\\\/how-uk-telecom-infrastructure-companies-manage-streetworks-permits-compliance\\\/\",\"name\":\"Streetworks Permits & Compliance | CA Telecom UK\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/catelecomuk.com\\\/blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/catelecomuk.com\\\/blog\\\/how-uk-telecom-infrastructure-companies-manage-streetworks-permits-compliance\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/catelecomuk.com\\\/blog\\\/how-uk-telecom-infrastructure-companies-manage-streetworks-permits-compliance\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/catelecomuk.com\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/CATELECOM-BLOG-.png\",\"datePublished\":\"2026-04-20T07:32:28+00:00\",\"dateModified\":\"2026-04-22T07:58:04+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/catelecomuk.com\\\/blog\\\/#\\\/schema\\\/person\\\/0b87c2feea098db2e198e89ab9edf88c\"},\"description\":\"Learn how UK telecom companies handle streetworks permits, NRSWA rules & compliance to keep every network project safe, legal & on time.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/catelecomuk.com\\\/blog\\\/how-uk-telecom-infrastructure-companies-manage-streetworks-permits-compliance\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/catelecomuk.com\\\/blog\\\/how-uk-telecom-infrastructure-companies-manage-streetworks-permits-compliance\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/catelecomuk.com\\\/blog\\\/how-uk-telecom-infrastructure-companies-manage-streetworks-permits-compliance\\\/#primaryimage\",\"url\":\"https:\\\/\\\/catelecomuk.com\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/CATELECOM-BLOG-.png\",\"contentUrl\":\"https:\\\/\\\/catelecomuk.com\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/CATELECOM-BLOG-.png\",\"width\":1536,\"height\":1024,\"caption\":\"Telecom engineers managing streetworks permits and compliance on a UK road\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/catelecomuk.com\\\/blog\\\/how-uk-telecom-infrastructure-companies-manage-streetworks-permits-compliance\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/catelecomuk.com\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"How UK Telecom Infrastructure Companies Manage Streetworks Permits &#038; Compliance\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/catelecomuk.com\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/catelecomuk.com\\\/blog\\\/\",\"name\":\"catelecomuk\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/catelecomuk.com\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/catelecomuk.com\\\/blog\\\/#\\\/schema\\\/person\\\/0b87c2feea098db2e198e89ab9edf88c\",\"name\":\"catelecomuk\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8e72a94078ab7a1d18747cc81f7e051d59f323c048f70e9ea59e61196f98c2e7?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8e72a94078ab7a1d18747cc81f7e051d59f323c048f70e9ea59e61196f98c2e7?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8e72a94078ab7a1d18747cc81f7e051d59f323c048f70e9ea59e61196f98c2e7?s=96&d=mm&r=g\",\"caption\":\"catelecomuk\"},\"sameAs\":[\"https:\\\/\\\/catelecomuk.com\\\/blog\"],\"url\":\"https:\\\/\\\/catelecomuk.com\\\/blog\\\/author\\\/catelecomuk\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Streetworks Permits & Compliance | CA Telecom UK","description":"Learn how UK telecom companies handle streetworks permits, NRSWA rules & compliance to keep every network project safe, legal & on time.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/catelecomuk.com\/blog\/how-uk-telecom-infrastructure-companies-manage-streetworks-permits-compliance\/","og_locale":"en_US","og_type":"article","og_title":"Streetworks Permits & Compliance | CA Telecom UK","og_description":"Learn how UK telecom companies handle streetworks permits, NRSWA rules & compliance to keep every network project safe, legal & on time.","og_url":"https:\/\/catelecomuk.com\/blog\/how-uk-telecom-infrastructure-companies-manage-streetworks-permits-compliance\/","og_site_name":"catelecomuk","article_published_time":"2026-04-20T07:32:28+00:00","article_modified_time":"2026-04-22T07:58:04+00:00","og_image":[{"width":1024,"height":683,"url":"https:\/\/catelecomuk.com\/blog\/wp-content\/uploads\/2026\/04\/CATELECOM-BLOG--1024x683.png","type":"image\/png"}],"author":"catelecomuk","twitter_card":"summary_large_image","twitter_misc":{"Written by":"catelecomuk","Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/catelecomuk.com\/blog\/how-uk-telecom-infrastructure-companies-manage-streetworks-permits-compliance\/#article","isPartOf":{"@id":"https:\/\/catelecomuk.com\/blog\/how-uk-telecom-infrastructure-companies-manage-streetworks-permits-compliance\/"},"author":{"name":"catelecomuk","@id":"https:\/\/catelecomuk.com\/blog\/#\/schema\/person\/0b87c2feea098db2e198e89ab9edf88c"},"headline":"How UK Telecom Infrastructure Companies Manage Streetworks Permits &#038; Compliance","datePublished":"2026-04-20T07:32:28+00:00","dateModified":"2026-04-22T07:58:04+00:00","mainEntityOfPage":{"@id":"https:\/\/catelecomuk.com\/blog\/how-uk-telecom-infrastructure-companies-manage-streetworks-permits-compliance\/"},"wordCount":1081,"commentCount":0,"image":{"@id":"https:\/\/catelecomuk.com\/blog\/how-uk-telecom-infrastructure-companies-manage-streetworks-permits-compliance\/#primaryimage"},"thumbnailUrl":"https:\/\/catelecomuk.com\/blog\/wp-content\/uploads\/2026\/04\/CATELECOM-BLOG-.png","inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/catelecomuk.com\/blog\/how-uk-telecom-infrastructure-companies-manage-streetworks-permits-compliance\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/catelecomuk.com\/blog\/how-uk-telecom-infrastructure-companies-manage-streetworks-permits-compliance\/","url":"https:\/\/catelecomuk.com\/blog\/how-uk-telecom-infrastructure-companies-manage-streetworks-permits-compliance\/","name":"Streetworks Permits & Compliance | CA Telecom UK","isPartOf":{"@id":"https:\/\/catelecomuk.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/catelecomuk.com\/blog\/how-uk-telecom-infrastructure-companies-manage-streetworks-permits-compliance\/#primaryimage"},"image":{"@id":"https:\/\/catelecomuk.com\/blog\/how-uk-telecom-infrastructure-companies-manage-streetworks-permits-compliance\/#primaryimage"},"thumbnailUrl":"https:\/\/catelecomuk.com\/blog\/wp-content\/uploads\/2026\/04\/CATELECOM-BLOG-.png","datePublished":"2026-04-20T07:32:28+00:00","dateModified":"2026-04-22T07:58:04+00:00","author":{"@id":"https:\/\/catelecomuk.com\/blog\/#\/schema\/person\/0b87c2feea098db2e198e89ab9edf88c"},"description":"Learn how UK telecom companies handle streetworks permits, NRSWA rules & compliance to keep every network project safe, legal & on time.","breadcrumb":{"@id":"https:\/\/catelecomuk.com\/blog\/how-uk-telecom-infrastructure-companies-manage-streetworks-permits-compliance\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/catelecomuk.com\/blog\/how-uk-telecom-infrastructure-companies-manage-streetworks-permits-compliance\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/catelecomuk.com\/blog\/how-uk-telecom-infrastructure-companies-manage-streetworks-permits-compliance\/#primaryimage","url":"https:\/\/catelecomuk.com\/blog\/wp-content\/uploads\/2026\/04\/CATELECOM-BLOG-.png","contentUrl":"https:\/\/catelecomuk.com\/blog\/wp-content\/uploads\/2026\/04\/CATELECOM-BLOG-.png","width":1536,"height":1024,"caption":"Telecom engineers managing streetworks permits and compliance on a UK road"},{"@type":"BreadcrumbList","@id":"https:\/\/catelecomuk.com\/blog\/how-uk-telecom-infrastructure-companies-manage-streetworks-permits-compliance\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/catelecomuk.com\/blog\/"},{"@type":"ListItem","position":2,"name":"How UK Telecom Infrastructure Companies Manage Streetworks Permits &#038; Compliance"}]},{"@type":"WebSite","@id":"https:\/\/catelecomuk.com\/blog\/#website","url":"https:\/\/catelecomuk.com\/blog\/","name":"catelecomuk","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/catelecomuk.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/catelecomuk.com\/blog\/#\/schema\/person\/0b87c2feea098db2e198e89ab9edf88c","name":"catelecomuk","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/8e72a94078ab7a1d18747cc81f7e051d59f323c048f70e9ea59e61196f98c2e7?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/8e72a94078ab7a1d18747cc81f7e051d59f323c048f70e9ea59e61196f98c2e7?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/8e72a94078ab7a1d18747cc81f7e051d59f323c048f70e9ea59e61196f98c2e7?s=96&d=mm&r=g","caption":"catelecomuk"},"sameAs":["https:\/\/catelecomuk.com\/blog"],"url":"https:\/\/catelecomuk.com\/blog\/author\/catelecomuk\/"}]}},"_links":{"self":[{"href":"https:\/\/catelecomuk.com\/blog\/wp-json\/wp\/v2\/posts\/305","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/catelecomuk.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/catelecomuk.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/catelecomuk.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/catelecomuk.com\/blog\/wp-json\/wp\/v2\/comments?post=305"}],"version-history":[{"count":0,"href":"https:\/\/catelecomuk.com\/blog\/wp-json\/wp\/v2\/posts\/305\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/catelecomuk.com\/blog\/wp-json\/wp\/v2\/media\/306"}],"wp:attachment":[{"href":"https:\/\/catelecomuk.com\/blog\/wp-json\/wp\/v2\/media?parent=305"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/catelecomuk.com\/blog\/wp-json\/wp\/v2\/categories?post=305"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/catelecomuk.com\/blog\/wp-json\/wp\/v2\/tags?post=305"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}