{"id":294,"date":"2026-03-30T11:33:18","date_gmt":"2026-03-30T11:33:18","guid":{"rendered":"https:\/\/catelecomuk.com\/blog\/?page_id=294"},"modified":"2026-04-01T11:52:53","modified_gmt":"2026-04-01T11:52:53","slug":"underground-trenching-for-ev-charger-installation-uk","status":"publish","type":"page","link":"https:\/\/catelecomuk.com\/blog\/underground-trenching-for-ev-charger-installation-uk\/","title":{"rendered":"Underground Trenching for EV Charger Installation in the UK: A Practical Guide for Businesses"},"content":{"rendered":"<p data-start=\"225\" data-end=\"307\">When planning EV charger installation, most people think about the charger itself.<\/p>\n<p data-start=\"309\" data-end=\"440\">But before any charger is installed, there is one critical step that makes everything possible. That step is underground trenching.<\/p>\n<p data-start=\"442\" data-end=\"694\">Trenching is a key part of groundwork. It is what allows power cables to safely run from the main supply to the charging points. If done correctly, it ensures long-term reliability. If done poorly, it can lead to delays, safety risks, and higher costs.<\/p>\n<p data-start=\"696\" data-end=\"803\">This guide explains underground trenching in a simple and practical way so you know exactly what to expect.<\/p>\n<h1 data-start=\"810\" data-end=\"856\">What is Underground Trenching in EV Projects<\/h1>\n<p data-start=\"858\" data-end=\"999\">Underground trenching is the process of digging channels in the ground to lay electrical cables that connect EV chargers to the power source.<\/p>\n<p data-start=\"1001\" data-end=\"1080\">These trenches are later filled and restored, leaving a clean and safe surface.<\/p>\n<p data-start=\"1082\" data-end=\"1241\">Trenching is not just digging. It involves careful planning, safety checks, and proper installation methods to protect both cables and existing infrastructure.<\/p>\n<h1 data-start=\"1248\" data-end=\"1279\">Why Trenching is So Important<\/h1>\n<p data-start=\"1281\" data-end=\"1381\">Trenching might seem like a basic step, but it plays a major role in the success of your EV project.<\/p>\n<h2 data-start=\"1383\" data-end=\"1412\">Protects electrical cables<\/h2>\n<p data-start=\"1413\" data-end=\"1497\">Cables placed underground are shielded from weather, traffic, and accidental damage.<\/p>\n<h2 data-start=\"1499\" data-end=\"1516\">Ensures safety<\/h2>\n<p data-start=\"1517\" data-end=\"1591\">Proper trenching reduces risks such as exposed wires or electrical faults.<\/p>\n<h2 data-start=\"1593\" data-end=\"1625\">Supports long-term durability<\/h2>\n<p data-start=\"1626\" data-end=\"1709\">Well-installed trenches help your system last longer with fewer maintenance issues.<\/p>\n<h2 data-start=\"1711\" data-end=\"1739\">Keeps your site organised<\/h2>\n<p data-start=\"1740\" data-end=\"1818\">Underground systems avoid clutter and improve the appearance of your property.<\/p>\n<h1 data-start=\"1825\" data-end=\"1857\">Step-by-Step Trenching Process<\/h1>\n<p data-start=\"1859\" data-end=\"1940\">Here is how trenching is typically carried out in commercial EV charger projects.<\/p>\n<h2 data-start=\"1947\" data-end=\"1983\">Site Survey and Utility Detection<\/h2>\n<p data-start=\"1985\" data-end=\"2034\">Before digging starts, a detailed survey is done.<\/p>\n<p data-start=\"2036\" data-end=\"2050\">This includes:<\/p>\n<ul data-start=\"2051\" data-end=\"2206\">\n<li data-start=\"2051\" data-end=\"2135\">Identifying existing underground utilities such as gas, water, and telecom lines<\/li>\n<li data-start=\"2136\" data-end=\"2166\">Marking safe trench routes<\/li>\n<li data-start=\"2167\" data-end=\"2206\">Checking soil and ground conditions<\/li>\n<\/ul>\n<p data-start=\"2208\" data-end=\"2263\">This step prevents accidental damage and costly delays.<\/p>\n<h2 data-start=\"2270\" data-end=\"2299\">Planning the Trench Layout<\/h2>\n<p data-start=\"2301\" data-end=\"2335\">A trench plan is created based on:<\/p>\n<ul data-start=\"2336\" data-end=\"2432\">\n<li data-start=\"2336\" data-end=\"2382\">Distance between power source and chargers<\/li>\n<li data-start=\"2383\" data-end=\"2405\">Number of chargers<\/li>\n<li data-start=\"2406\" data-end=\"2432\">Future expansion needs<\/li>\n<\/ul>\n<p data-start=\"2434\" data-end=\"2511\">Good planning ensures efficient cable routing and avoids unnecessary digging.<\/p>\n<h2 data-start=\"2518\" data-end=\"2531\">Excavation<\/h2>\n<p data-start=\"2533\" data-end=\"2585\">This is the stage where trenches are physically dug.<\/p>\n<p data-start=\"2587\" data-end=\"2606\">Key considerations:<\/p>\n<ul data-start=\"2607\" data-end=\"2728\">\n<li data-start=\"2607\" data-end=\"2650\">Correct depth for safety and compliance<\/li>\n<li data-start=\"2651\" data-end=\"2688\">Proper width to accommodate ducts<\/li>\n<li data-start=\"2689\" data-end=\"2728\">Safe handling of excavated material<\/li>\n<\/ul>\n<p data-start=\"2730\" data-end=\"2845\">Depth is important because shallow trenches can expose cables to damage, while overly deep trenches increase costs.<\/p>\n<h2 data-start=\"2852\" data-end=\"2871\">Installing Ducts<\/h2>\n<p data-start=\"2873\" data-end=\"2923\">Ducts are protective pipes placed inside trenches.<\/p>\n<p data-start=\"2925\" data-end=\"2942\">They are used to:<\/p>\n<ul data-start=\"2943\" data-end=\"3063\">\n<li data-start=\"2943\" data-end=\"2982\">Protect cables from physical damage<\/li>\n<li data-start=\"2983\" data-end=\"3035\">Allow easy replacement or upgrades in the future<\/li>\n<li data-start=\"3036\" data-end=\"3063\">Improve system lifespan<\/li>\n<\/ul>\n<p data-start=\"3065\" data-end=\"3135\">This is a critical step that many low-quality installations get wrong.<\/p>\n<h2 data-start=\"3142\" data-end=\"3157\">Cable Laying<\/h2>\n<p data-start=\"3159\" data-end=\"3227\">Once ducts are installed, electrical cables are pulled through them.<\/p>\n<p data-start=\"3229\" data-end=\"3266\">This must be done carefully to avoid:<\/p>\n<ul data-start=\"3267\" data-end=\"3326\">\n<li data-start=\"3267\" data-end=\"3283\">Cable damage<\/li>\n<li data-start=\"3284\" data-end=\"3308\">Improper connections<\/li>\n<li data-start=\"3309\" data-end=\"3326\">Future faults<\/li>\n<\/ul>\n<h2 data-start=\"3333\" data-end=\"3358\">Backfilling the Trench<\/h2>\n<p data-start=\"3360\" data-end=\"3439\">After installation, trenches are filled back with soil or appropriate material.<\/p>\n<p data-start=\"3441\" data-end=\"3463\">This process includes:<\/p>\n<ul data-start=\"3464\" data-end=\"3553\">\n<li data-start=\"3464\" data-end=\"3497\">Layered filling for stability<\/li>\n<li data-start=\"3498\" data-end=\"3521\">Compacting the soil<\/li>\n<li data-start=\"3522\" data-end=\"3553\">Ensuring no air gaps remain<\/li>\n<\/ul>\n<h2 data-start=\"3560\" data-end=\"3584\">Surface Reinstatement<\/h2>\n<p data-start=\"3586\" data-end=\"3626\">The final step is restoring the surface.<\/p>\n<p data-start=\"3628\" data-end=\"3668\">Depending on the site, this may include:<\/p>\n<ul data-start=\"3669\" data-end=\"3710\">\n<li data-start=\"3669\" data-end=\"3679\">Tarmac<\/li>\n<li data-start=\"3680\" data-end=\"3692\">Concrete<\/li>\n<li data-start=\"3693\" data-end=\"3710\">Paving blocks<\/li>\n<\/ul>\n<p data-start=\"3712\" data-end=\"3774\">The goal is to leave the area safe, level, and visually clean.<\/p>\n<h1 data-start=\"3781\" data-end=\"3813\">How Deep Should EV Trenches Be<\/h1>\n<p data-start=\"3815\" data-end=\"3880\">Depth depends on UK standards and site conditions, but generally:<\/p>\n<ul data-start=\"3882\" data-end=\"3959\">\n<li data-start=\"3882\" data-end=\"3917\">Pedestrian areas: around 450 mm<\/li>\n<li data-start=\"3918\" data-end=\"3959\">Road crossings: around 600 mm or more<\/li>\n<\/ul>\n<p data-start=\"3961\" data-end=\"3983\">Depth also depends on:<\/p>\n<ul data-start=\"3984\" data-end=\"4043\">\n<li data-start=\"3984\" data-end=\"3998\">Cable type<\/li>\n<li data-start=\"3999\" data-end=\"4020\">Load requirements<\/li>\n<li data-start=\"4021\" data-end=\"4043\">Safety regulations<\/li>\n<\/ul>\n<p data-start=\"4045\" data-end=\"4099\">Always follow proper guidelines to avoid future risks.<\/p>\n<h1 data-start=\"4106\" data-end=\"4135\">Cost of Trenching in the UK<\/h1>\n<p data-start=\"4137\" data-end=\"4201\">Trenching costs vary depending on the complexity of the project.<\/p>\n<h2 data-start=\"4203\" data-end=\"4228\">Typical Cost Estimates<\/h2>\n<ul data-start=\"4230\" data-end=\"4316\">\n<li data-start=\"4230\" data-end=\"4272\">Simple trenching: \u00a330 to \u00a370 per metre<\/li>\n<li data-start=\"4273\" data-end=\"4316\">Complex projects: \u00a370 to \u00a3150 per metre<\/li>\n<\/ul>\n<h2 data-start=\"4323\" data-end=\"4347\">What Affects the Cost<\/h2>\n<h3 data-start=\"4349\" data-end=\"4370\">Ground conditions<\/h3>\n<p data-start=\"4371\" data-end=\"4428\">Hard ground or rock increases labour and equipment costs.<\/p>\n<h3 data-start=\"4430\" data-end=\"4442\">Distance<\/h3>\n<p data-start=\"4443\" data-end=\"4488\">Longer cable routes mean more trenching work.<\/p>\n<h3 data-start=\"4490\" data-end=\"4503\">Obstacles<\/h3>\n<p data-start=\"4504\" data-end=\"4564\">Existing utilities and structures make the job more complex.<\/p>\n<h3 data-start=\"4566\" data-end=\"4582\">Surface type<\/h3>\n<p data-start=\"4583\" data-end=\"4635\">Restoring concrete or paved areas is more expensive.<\/p>\n<h3 data-start=\"4637\" data-end=\"4659\">Access limitations<\/h3>\n<p data-start=\"4660\" data-end=\"4716\">Tight or restricted areas require specialised equipment.<\/p>\n<h1 data-start=\"4723\" data-end=\"4762\">Common Problems in Trenching Projects<\/h1>\n<p data-start=\"4764\" data-end=\"4813\">Understanding common issues helps you avoid them.<\/p>\n<h2 data-start=\"4815\" data-end=\"4844\">Hitting existing utilities<\/h2>\n<p data-start=\"4845\" data-end=\"4892\">This can cause serious delays and safety risks.<\/p>\n<h2 data-start=\"4899\" data-end=\"4919\">Poor trench depth<\/h2>\n<p data-start=\"4920\" data-end=\"4963\">Incorrect depth can lead to damaged cables.<\/p>\n<h2 data-start=\"4970\" data-end=\"4989\">Weak backfilling<\/h2>\n<p data-start=\"4990\" data-end=\"5043\">Improper filling can cause sinking or surface damage.<\/p>\n<h2 data-start=\"5050\" data-end=\"5071\">No future planning<\/h2>\n<p data-start=\"5072\" data-end=\"5117\">Lack of spare ducting means re-digging later.<\/p>\n<h1 data-start=\"5124\" data-end=\"5165\">Best Practices for Successful Trenching<\/h1>\n<h2 data-start=\"5167\" data-end=\"5200\">Always conduct a proper survey<\/h2>\n<p data-start=\"5201\" data-end=\"5250\">Never skip utility detection and site assessment.<\/p>\n<h2 data-start=\"5257\" data-end=\"5284\">Use high-quality ducting<\/h2>\n<p data-start=\"5285\" data-end=\"5325\">This protects your investment long-term.<\/p>\n<h2 data-start=\"5332\" data-end=\"5353\">Plan for expansion<\/h2>\n<p data-start=\"5354\" data-end=\"5415\">Install extra ducts even if you do not need them immediately.<\/p>\n<h2 data-start=\"5422\" data-end=\"5458\">Work with experienced contractors<\/h2>\n<p data-start=\"5459\" data-end=\"5515\">Trenching is a specialised task that requires expertise.<\/p>\n<h1 data-start=\"5522\" data-end=\"5568\">Trenching for Future-Proof EV Infrastructure<\/h1>\n<p data-start=\"5570\" data-end=\"5662\">EV demand will continue to grow. Businesses that prepare now will save time and money later.<\/p>\n<p data-start=\"5664\" data-end=\"5696\">Future-ready trenching includes:<\/p>\n<ul data-start=\"5697\" data-end=\"5783\">\n<li data-start=\"5697\" data-end=\"5720\">Extra duct capacity<\/li>\n<li data-start=\"5721\" data-end=\"5741\">Scalable layouts<\/li>\n<li data-start=\"5742\" data-end=\"5783\">Smart routing for additional chargers<\/li>\n<\/ul>\n<p data-start=\"5785\" data-end=\"5829\">This reduces the need for future excavation.<\/p>\n<h1 data-start=\"5836\" data-end=\"5871\">Where Trenching is Most Important<\/h1>\n<p data-start=\"5873\" data-end=\"5905\">Trenching plays a major role in:<\/p>\n<ul data-start=\"5907\" data-end=\"6026\">\n<li data-start=\"5907\" data-end=\"5931\">Commercial car parks<\/li>\n<li data-start=\"5932\" data-end=\"5948\">Retail parks<\/li>\n<li data-start=\"5949\" data-end=\"5972\">Office developments<\/li>\n<li data-start=\"5973\" data-end=\"5991\">Logistics hubs<\/li>\n<li data-start=\"5992\" data-end=\"6026\">Public charging infrastructure<\/li>\n<\/ul>\n<p data-start=\"6028\" data-end=\"6121\">In these environments, proper groundwork ensures smooth operations and long-term reliability.<\/p>\n<h1 data-start=\"6128\" data-end=\"6144\">Final Thoughts<\/h1>\n<p data-start=\"6146\" data-end=\"6266\">Underground trenching is one of the most important parts of <strong>EV charger installation<\/strong>, even though it is often overlooked.<\/p>\n<p data-start=\"6268\" data-end=\"6349\">It forms the foundation for safe, efficient, and durable charging infrastructure.<\/p>\n<p data-start=\"6351\" data-end=\"6447\">Done right, it prevents problems, reduces maintenance, and prepares your site for future growth.<\/p>\n<p data-start=\"6449\" data-end=\"6515\">Done poorly, it can lead to costly repairs and operational issues.<\/p>\n<h2 data-start=\"6522\" data-end=\"6555\">Need Expert Trenching Services<\/h2>\n<p data-start=\"6557\" data-end=\"6687\">If you are planning EV charger installation, working with <a href=\"https:\/\/catelecomuk.com\/\"><strong>experienced groundwork and civil engineering professionals<\/strong><\/a> is essential.<\/p>\n<p data-start=\"6689\" data-end=\"6716\">A skilled team will ensure:<\/p>\n<ul data-start=\"6717\" data-end=\"6823\">\n<li data-start=\"6717\" data-end=\"6736\">Safe excavation<\/li>\n<li data-start=\"6737\" data-end=\"6755\">Proper ducting<\/li>\n<li data-start=\"6756\" data-end=\"6787\">Reliable cable installation<\/li>\n<li data-start=\"6788\" data-end=\"6823\">Clean and durable reinstatement<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>When planning EV charger installation, most people think about the charger itself. But before any charger is installed, there is one critical step that makes everything possible. That step is underground trenching. Trenching is a key part of groundwork. It is what allows power cables to safely run from the main supply to the charging [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-294","page","type-page","status-publish","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>EV Trenching UK: Costs, Depth and Installation Guide- catelecomuk<\/title>\n<meta name=\"description\" content=\"Learn EV trenching in the UK, including depth, costs, ducting, and safe cable installation for reliable and future-ready charging infrastructure.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/catelecomuk.com\/blog\/underground-trenching-for-ev-charger-installation-uk\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"EV Trenching UK: Costs, Depth and Installation Guide- catelecomuk\" \/>\n<meta property=\"og:description\" content=\"Learn EV trenching in the UK, including depth, costs, ducting, and safe cable installation for reliable and future-ready charging infrastructure.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/catelecomuk.com\/blog\/underground-trenching-for-ev-charger-installation-uk\/\" \/>\n<meta property=\"og:site_name\" content=\"catelecomuk\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-01T11:52:53+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/catelecomuk.com\\\/blog\\\/underground-trenching-for-ev-charger-installation-uk\\\/\",\"url\":\"https:\\\/\\\/catelecomuk.com\\\/blog\\\/underground-trenching-for-ev-charger-installation-uk\\\/\",\"name\":\"EV Trenching UK: Costs, Depth and Installation Guide- catelecomuk\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/catelecomuk.com\\\/blog\\\/#website\"},\"datePublished\":\"2026-03-30T11:33:18+00:00\",\"dateModified\":\"2026-04-01T11:52:53+00:00\",\"description\":\"Learn EV trenching in the UK, including depth, costs, ducting, and safe cable installation for reliable and future-ready charging infrastructure.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/catelecomuk.com\\\/blog\\\/underground-trenching-for-ev-charger-installation-uk\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/catelecomuk.com\\\/blog\\\/underground-trenching-for-ev-charger-installation-uk\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/catelecomuk.com\\\/blog\\\/underground-trenching-for-ev-charger-installation-uk\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/catelecomuk.com\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Underground Trenching for EV Charger Installation in the UK: A Practical Guide for Businesses\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/catelecomuk.com\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/catelecomuk.com\\\/blog\\\/\",\"name\":\"catelecomuk\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/catelecomuk.com\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"EV Trenching UK: Costs, Depth and Installation Guide- catelecomuk","description":"Learn EV trenching in the UK, including depth, costs, ducting, and safe cable installation for reliable and future-ready charging infrastructure.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/catelecomuk.com\/blog\/underground-trenching-for-ev-charger-installation-uk\/","og_locale":"en_US","og_type":"article","og_title":"EV Trenching UK: Costs, Depth and Installation Guide- catelecomuk","og_description":"Learn EV trenching in the UK, including depth, costs, ducting, and safe cable installation for reliable and future-ready charging infrastructure.","og_url":"https:\/\/catelecomuk.com\/blog\/underground-trenching-for-ev-charger-installation-uk\/","og_site_name":"catelecomuk","article_modified_time":"2026-04-01T11:52:53+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/catelecomuk.com\/blog\/underground-trenching-for-ev-charger-installation-uk\/","url":"https:\/\/catelecomuk.com\/blog\/underground-trenching-for-ev-charger-installation-uk\/","name":"EV Trenching UK: Costs, Depth and Installation Guide- catelecomuk","isPartOf":{"@id":"https:\/\/catelecomuk.com\/blog\/#website"},"datePublished":"2026-03-30T11:33:18+00:00","dateModified":"2026-04-01T11:52:53+00:00","description":"Learn EV trenching in the UK, including depth, costs, ducting, and safe cable installation for reliable and future-ready charging infrastructure.","breadcrumb":{"@id":"https:\/\/catelecomuk.com\/blog\/underground-trenching-for-ev-charger-installation-uk\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/catelecomuk.com\/blog\/underground-trenching-for-ev-charger-installation-uk\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/catelecomuk.com\/blog\/underground-trenching-for-ev-charger-installation-uk\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/catelecomuk.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Underground Trenching for EV Charger Installation in the UK: A Practical Guide for Businesses"}]},{"@type":"WebSite","@id":"https:\/\/catelecomuk.com\/blog\/#website","url":"https:\/\/catelecomuk.com\/blog\/","name":"catelecomuk","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/catelecomuk.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/catelecomuk.com\/blog\/wp-json\/wp\/v2\/pages\/294","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/catelecomuk.com\/blog\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/catelecomuk.com\/blog\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/catelecomuk.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/catelecomuk.com\/blog\/wp-json\/wp\/v2\/comments?post=294"}],"version-history":[{"count":0,"href":"https:\/\/catelecomuk.com\/blog\/wp-json\/wp\/v2\/pages\/294\/revisions"}],"wp:attachment":[{"href":"https:\/\/catelecomuk.com\/blog\/wp-json\/wp\/v2\/media?parent=294"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}