{"id":292,"date":"2026-03-15T11:31:54","date_gmt":"2026-03-15T11:31:54","guid":{"rendered":"https:\/\/catelecomuk.com\/blog\/?page_id=292"},"modified":"2026-04-01T11:33:11","modified_gmt":"2026-04-01T11:33:11","slug":"ev-charger-groundwork-uk","status":"publish","type":"page","link":"https:\/\/catelecomuk.com\/blog\/ev-charger-groundwork-uk\/","title":{"rendered":"Groundwork for Commercial EV Charger Installation in the UK"},"content":{"rendered":"<p data-start=\"374\" data-end=\"471\">When businesses think about EV charger installation, they often focus on the chargers themselves.<\/p>\n<p data-start=\"473\" data-end=\"577\">But in reality, the most critical part happens before any charger is installed. That part is groundwork.<\/p>\n<p data-start=\"579\" data-end=\"769\">Groundwork is what prepares your site to safely support EV charging infrastructure. If this stage is not done properly, the entire project can face delays, higher costs, or long-term issues.<\/p>\n<p data-start=\"771\" data-end=\"914\">This guide explains everything you need to know about groundwork for commercial EV charger installation in the UK in a clear and practical way.<\/p>\n<h1 data-start=\"921\" data-end=\"968\">What is Groundwork in EV Charger Installation<\/h1>\n<p data-start=\"970\" data-end=\"1085\">Groundwork refers to all the civil engineering work required to prepare a site before EV chargers can be installed.<\/p>\n<p data-start=\"1087\" data-end=\"1099\">It includes:<\/p>\n<ul data-start=\"1100\" data-end=\"1245\">\n<li data-start=\"1100\" data-end=\"1128\">Excavation and trenching<\/li>\n<li data-start=\"1129\" data-end=\"1156\">Cable duct installation<\/li>\n<li data-start=\"1157\" data-end=\"1184\">Drainage considerations<\/li>\n<li data-start=\"1185\" data-end=\"1219\">Base construction for chargers<\/li>\n<li data-start=\"1220\" data-end=\"1245\">Surface reinstatement<\/li>\n<\/ul>\n<p data-start=\"1247\" data-end=\"1348\">In simple terms, groundwork is what allows electrical systems to be installed safely and efficiently.<\/p>\n<h1 data-start=\"1355\" data-end=\"1387\">Why Groundwork is So Important<\/h1>\n<p data-start=\"1389\" data-end=\"1487\">Many businesses underestimate this phase, but it plays a major role in the success of the project.<\/p>\n<p data-start=\"1489\" data-end=\"1512\">Here is why it matters:<\/p>\n<h2 data-start=\"1514\" data-end=\"1547\">It protects the infrastructure<\/h2>\n<p data-start=\"1548\" data-end=\"1638\">Proper trenching and ducting protect cables from damage, water, and environmental factors.<\/p>\n<h2 data-start=\"1640\" data-end=\"1660\">It ensures safety<\/h2>\n<p data-start=\"1661\" data-end=\"1751\">Incorrect groundwork can lead to hazards such as exposed cables or unstable charger units.<\/p>\n<h2 data-start=\"1753\" data-end=\"1779\">It reduces future costs<\/h2>\n<p data-start=\"1780\" data-end=\"1866\">Fixing poor groundwork later is far more expensive than doing it right the first time.<\/p>\n<h2 data-start=\"1868\" data-end=\"1894\">It supports scalability<\/h2>\n<p data-start=\"1895\" data-end=\"1970\">Well-planned groundwork makes it easier to add more chargers in the future.<\/p>\n<h1 data-start=\"1977\" data-end=\"2010\">Step-by-Step Groundwork Process<\/h1>\n<p data-start=\"2012\" data-end=\"2080\">Understanding the process helps you plan better and avoid surprises.<\/p>\n<h2 data-start=\"2082\" data-end=\"2111\">Site Survey and Assessment<\/h2>\n<p data-start=\"2113\" data-end=\"2158\">The first step is a detailed site inspection.<\/p>\n<p data-start=\"2160\" data-end=\"2176\">Engineers check:<\/p>\n<ul data-start=\"2177\" data-end=\"2267\">\n<li data-start=\"2177\" data-end=\"2195\">Soil condition<\/li>\n<li data-start=\"2196\" data-end=\"2230\">Existing utilities underground<\/li>\n<li data-start=\"2231\" data-end=\"2249\">Parking layout<\/li>\n<li data-start=\"2250\" data-end=\"2267\">Access points<\/li>\n<\/ul>\n<p data-start=\"2269\" data-end=\"2318\">This helps identify any risks before work begins.<\/p>\n<h2 data-start=\"2325\" data-end=\"2347\">Planning and Design<\/h2>\n<p data-start=\"2349\" data-end=\"2399\">Based on the survey, a groundwork plan is created.<\/p>\n<p data-start=\"2401\" data-end=\"2415\">This includes:<\/p>\n<ul data-start=\"2416\" data-end=\"2513\">\n<li data-start=\"2416\" data-end=\"2433\">Trench routes<\/li>\n<li data-start=\"2434\" data-end=\"2467\">Depth and width of excavation<\/li>\n<li data-start=\"2468\" data-end=\"2486\">Ducting layout<\/li>\n<li data-start=\"2487\" data-end=\"2513\">Charger base positions<\/li>\n<\/ul>\n<p data-start=\"2515\" data-end=\"2580\">Planning is essential to avoid conflicts with existing utilities.<\/p>\n<h2 data-start=\"2587\" data-end=\"2614\">Excavation and Trenching<\/h2>\n<p data-start=\"2616\" data-end=\"2651\">This is where physical work starts.<\/p>\n<p data-start=\"2653\" data-end=\"2731\">Trenches are dug to lay cables that will connect chargers to the power source.<\/p>\n<p data-start=\"2733\" data-end=\"2745\">Key factors:<\/p>\n<ul data-start=\"2746\" data-end=\"2881\">\n<li data-start=\"2746\" data-end=\"2789\">Correct depth for safety and compliance<\/li>\n<li data-start=\"2790\" data-end=\"2842\">Avoiding damage to existing underground services<\/li>\n<li data-start=\"2843\" data-end=\"2881\">Proper spacing for multiple cables<\/li>\n<\/ul>\n<h2 data-start=\"2888\" data-end=\"2919\">Ducting and Cable Protection<\/h2>\n<p data-start=\"2921\" data-end=\"2986\">Ducts are installed inside trenches to protect electrical cables.<\/p>\n<p data-start=\"2988\" data-end=\"3000\">These ducts:<\/p>\n<ul data-start=\"3001\" data-end=\"3113\">\n<li data-start=\"3001\" data-end=\"3028\">Prevent physical damage<\/li>\n<li data-start=\"3029\" data-end=\"3075\">Allow easy cable replacement in the future<\/li>\n<li data-start=\"3076\" data-end=\"3113\">Improve overall system durability<\/li>\n<\/ul>\n<h2 data-start=\"3120\" data-end=\"3153\">Base Construction for Chargers<\/h2>\n<p data-start=\"3155\" data-end=\"3201\">Each EV charger needs a solid and stable base.<\/p>\n<p data-start=\"3203\" data-end=\"3225\">This usually involves:<\/p>\n<ul data-start=\"3226\" data-end=\"3312\">\n<li data-start=\"3226\" data-end=\"3250\">Concrete foundations<\/li>\n<li data-start=\"3251\" data-end=\"3274\">Mounting structures<\/li>\n<li data-start=\"3275\" data-end=\"3312\">Proper alignment for installation<\/li>\n<\/ul>\n<p data-start=\"3314\" data-end=\"3366\">A weak base can lead to long-term structural issues.<\/p>\n<h2 data-start=\"3373\" data-end=\"3413\">Backfilling and Surface Reinstatement<\/h2>\n<p data-start=\"3415\" data-end=\"3481\">Once ducts and foundations are in place, trenches are filled back.<\/p>\n<p data-start=\"3483\" data-end=\"3512\">The surface is then restored.<\/p>\n<p data-start=\"3514\" data-end=\"3531\">This may include:<\/p>\n<ul data-start=\"3532\" data-end=\"3572\">\n<li data-start=\"3532\" data-end=\"3542\">Tarmac<\/li>\n<li data-start=\"3543\" data-end=\"3555\">Concrete<\/li>\n<li data-start=\"3556\" data-end=\"3572\">Block paving<\/li>\n<\/ul>\n<p data-start=\"3574\" data-end=\"3641\">The goal is to return the site to its original condition or better.<\/p>\n<h1 data-start=\"3648\" data-end=\"3696\">Cost of Groundwork for EV Charger Installation<\/h1>\n<p data-start=\"3698\" data-end=\"3766\">Groundwork costs vary depending on site conditions and project size.<\/p>\n<h2 data-start=\"3768\" data-end=\"3789\">Typical Cost Range<\/h2>\n<ul data-start=\"3791\" data-end=\"3903\">\n<li data-start=\"3791\" data-end=\"3827\">Small projects: \u00a31,000 to \u00a35,000<\/li>\n<li data-start=\"3828\" data-end=\"3866\">Medium projects: \u00a35,000 to \u00a320,000<\/li>\n<li data-start=\"3867\" data-end=\"3903\">Complex sites: \u00a320,000 and above<\/li>\n<\/ul>\n<h2 data-start=\"3910\" data-end=\"3942\">What Affects Groundwork Costs<\/h2>\n<p data-start=\"3944\" data-end=\"3979\">Several factors influence the cost:<\/p>\n<h3 data-start=\"3981\" data-end=\"4002\">Ground conditions<\/h3>\n<p data-start=\"4003\" data-end=\"4053\">Hard soil or rock increases excavation difficulty.<\/p>\n<h3 data-start=\"4055\" data-end=\"4070\">Site layout<\/h3>\n<p data-start=\"4071\" data-end=\"4107\">Long cable runs mean more trenching.<\/p>\n<h3 data-start=\"4109\" data-end=\"4131\">Existing utilities<\/h3>\n<p data-start=\"4132\" data-end=\"4196\">Working around gas, water, or telecom lines requires extra care.<\/p>\n<h3 data-start=\"4198\" data-end=\"4214\">Surface type<\/h3>\n<p data-start=\"4215\" data-end=\"4282\">Reinstating concrete or paved areas costs more than basic surfaces.<\/p>\n<h3 data-start=\"4284\" data-end=\"4301\">Accessibility<\/h3>\n<p data-start=\"4302\" data-end=\"4357\">Limited access areas may require specialised equipment.<\/p>\n<h1 data-start=\"4364\" data-end=\"4394\">Common Groundwork Challenges<\/h1>\n<p data-start=\"4396\" data-end=\"4447\">Groundwork is often where unexpected issues appear.<\/p>\n<h2 data-start=\"4449\" data-end=\"4473\">Underground utilities<\/h2>\n<p data-start=\"4474\" data-end=\"4525\">Existing cables and pipes can complicate trenching.<\/p>\n<h2 data-start=\"4527\" data-end=\"4550\">Poor soil conditions<\/h2>\n<p data-start=\"4551\" data-end=\"4612\">Soft or unstable ground may require additional reinforcement.<\/p>\n<h2 data-start=\"4614\" data-end=\"4634\">Drainage problems<\/h2>\n<p data-start=\"4635\" data-end=\"4704\">Water accumulation can damage infrastructure if not managed properly.<\/p>\n<h2 data-start=\"4706\" data-end=\"4726\">Restricted access<\/h2>\n<p data-start=\"4727\" data-end=\"4778\">Urban locations or tight spaces can slow down work.<\/p>\n<h1 data-start=\"4785\" data-end=\"4808\">How to Avoid Problems<\/h1>\n<p data-start=\"4810\" data-end=\"4865\">You can reduce risks by following a few best practices.<\/p>\n<h2 data-start=\"4867\" data-end=\"4898\">Conduct a proper site survey<\/h2>\n<p data-start=\"4899\" data-end=\"4956\">Never skip this step. It prevents costly surprises later.<\/p>\n<h2 data-start=\"4963\" data-end=\"4999\">Work with experienced contractors<\/h2>\n<p data-start=\"5000\" data-end=\"5072\">Groundwork requires expertise in civil engineering and utility projects.<\/p>\n<h2 data-start=\"5079\" data-end=\"5107\">Plan for future expansion<\/h2>\n<p data-start=\"5108\" data-end=\"5174\">Install extra ducting where possible to avoid digging again later.<\/p>\n<h2 data-start=\"5181\" data-end=\"5205\">Follow UK regulations<\/h2>\n<p data-start=\"5206\" data-end=\"5256\">Compliance ensures safety and avoids legal issues.<\/p>\n<h1 data-start=\"5263\" data-end=\"5296\">Groundwork and Future Expansion<\/h1>\n<p data-start=\"5298\" data-end=\"5401\">One of the smartest decisions you can make is to prepare for future growth during the groundwork stage.<\/p>\n<p data-start=\"5403\" data-end=\"5420\">This can include:<\/p>\n<ul data-start=\"5421\" data-end=\"5519\">\n<li data-start=\"5421\" data-end=\"5452\">Installing additional ducts<\/li>\n<li data-start=\"5453\" data-end=\"5488\">Leaving space for more chargers<\/li>\n<li data-start=\"5489\" data-end=\"5519\">Designing scalable layouts<\/li>\n<\/ul>\n<p data-start=\"5521\" data-end=\"5588\">This approach saves time and money when you decide to expand later.<\/p>\n<h1 data-start=\"5595\" data-end=\"5647\">Industries That Require Strong Groundwork Planning<\/h1>\n<p data-start=\"5649\" data-end=\"5703\">Some sectors rely heavily on well-executed groundwork:<\/p>\n<ul data-start=\"5705\" data-end=\"5843\">\n<li data-start=\"5705\" data-end=\"5738\">Commercial parking facilities<\/li>\n<li data-start=\"5739\" data-end=\"5755\">Retail parks<\/li>\n<li data-start=\"5756\" data-end=\"5784\">Logistics and warehouses<\/li>\n<li data-start=\"5785\" data-end=\"5808\">Office developments<\/li>\n<li data-start=\"5809\" data-end=\"5843\">Public infrastructure projects<\/li>\n<\/ul>\n<p data-start=\"5845\" data-end=\"5941\">These environments often require large-scale installations where groundwork quality is critical.<\/p>\n<h1 data-start=\"5948\" data-end=\"5964\">Final Thoughts<\/h1>\n<p data-start=\"5966\" data-end=\"6045\">Groundwork is the foundation of any successful EV charger installation project.<\/p>\n<p data-start=\"6047\" data-end=\"6137\">While it may not be the most visible part of the process, it is one of the most important.<\/p>\n<p data-start=\"6139\" data-end=\"6165\">Done properly, it ensures:<\/p>\n<ul data-start=\"6166\" data-end=\"6258\">\n<li data-start=\"6166\" data-end=\"6202\">Safe and reliable infrastructure<\/li>\n<li data-start=\"6203\" data-end=\"6230\">Lower maintenance costs<\/li>\n<li data-start=\"6231\" data-end=\"6258\">Easier future expansion<\/li>\n<\/ul>\n<p data-start=\"6260\" data-end=\"6356\">Ignoring or underestimating groundwork can lead to delays, higher costs, and long-term problems.<\/p>\n<h2 data-start=\"6363\" data-end=\"6396\">Need Expert Groundwork Support<\/h2>\n<p data-start=\"6398\" data-end=\"6547\">If you are planning a commercial EV charging project, working with experienced<a href=\"https:\/\/catelecomuk.com\/\"><strong> civil engineering and telecom infrastructure<\/strong> <\/a>specialists is essential.<\/p>\n<p data-start=\"6549\" data-end=\"6576\">A skilled team will handle:<\/p>\n<ul data-start=\"6577\" data-end=\"6670\">\n<li data-start=\"6577\" data-end=\"6593\">Site surveys<\/li>\n<li data-start=\"6594\" data-end=\"6619\">Trenching and ducting<\/li>\n<li data-start=\"6620\" data-end=\"6639\">Foundation work<\/li>\n<li data-start=\"6640\" data-end=\"6670\">Full surface reinstatement<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>When businesses think about EV charger installation, they often focus on the chargers themselves. But in reality, the most critical part happens before any charger is installed. That part is groundwork. Groundwork is what prepares your site to safely support EV charging infrastructure. If this stage is not done properly, the entire project can face [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-292","page","type-page","status-publish","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>EV Charger Groundwork in UK: Costs &amp; Process Guide - catelecomuk<\/title>\n<meta name=\"description\" content=\"Learn EV charger groundwork in the UK, including trenching, ducting, costs, and key steps for safe and scalable installation.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/catelecomuk.com\/blog\/ev-charger-groundwork-uk\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"EV Charger Groundwork in UK: Costs &amp; Process Guide - catelecomuk\" \/>\n<meta property=\"og:description\" content=\"Learn EV charger groundwork in the UK, including trenching, ducting, costs, and key steps for safe and scalable installation.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/catelecomuk.com\/blog\/ev-charger-groundwork-uk\/\" \/>\n<meta property=\"og:site_name\" content=\"catelecomuk\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-01T11:33:11+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/catelecomuk.com\\\/blog\\\/ev-charger-groundwork-uk\\\/\",\"url\":\"https:\\\/\\\/catelecomuk.com\\\/blog\\\/ev-charger-groundwork-uk\\\/\",\"name\":\"EV Charger Groundwork in UK: Costs & Process Guide - catelecomuk\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/catelecomuk.com\\\/blog\\\/#website\"},\"datePublished\":\"2026-03-15T11:31:54+00:00\",\"dateModified\":\"2026-04-01T11:33:11+00:00\",\"description\":\"Learn EV charger groundwork in the UK, including trenching, ducting, costs, and key steps for safe and scalable installation.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/catelecomuk.com\\\/blog\\\/ev-charger-groundwork-uk\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/catelecomuk.com\\\/blog\\\/ev-charger-groundwork-uk\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/catelecomuk.com\\\/blog\\\/ev-charger-groundwork-uk\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/catelecomuk.com\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Groundwork for Commercial EV Charger Installation in the UK\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/catelecomuk.com\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/catelecomuk.com\\\/blog\\\/\",\"name\":\"catelecomuk\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/catelecomuk.com\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"EV Charger Groundwork in UK: Costs & Process Guide - catelecomuk","description":"Learn EV charger groundwork in the UK, including trenching, ducting, costs, and key steps for safe and scalable installation.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/catelecomuk.com\/blog\/ev-charger-groundwork-uk\/","og_locale":"en_US","og_type":"article","og_title":"EV Charger Groundwork in UK: Costs & Process Guide - catelecomuk","og_description":"Learn EV charger groundwork in the UK, including trenching, ducting, costs, and key steps for safe and scalable installation.","og_url":"https:\/\/catelecomuk.com\/blog\/ev-charger-groundwork-uk\/","og_site_name":"catelecomuk","article_modified_time":"2026-04-01T11:33:11+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/catelecomuk.com\/blog\/ev-charger-groundwork-uk\/","url":"https:\/\/catelecomuk.com\/blog\/ev-charger-groundwork-uk\/","name":"EV Charger Groundwork in UK: Costs & Process Guide - catelecomuk","isPartOf":{"@id":"https:\/\/catelecomuk.com\/blog\/#website"},"datePublished":"2026-03-15T11:31:54+00:00","dateModified":"2026-04-01T11:33:11+00:00","description":"Learn EV charger groundwork in the UK, including trenching, ducting, costs, and key steps for safe and scalable installation.","breadcrumb":{"@id":"https:\/\/catelecomuk.com\/blog\/ev-charger-groundwork-uk\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/catelecomuk.com\/blog\/ev-charger-groundwork-uk\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/catelecomuk.com\/blog\/ev-charger-groundwork-uk\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/catelecomuk.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Groundwork for Commercial EV Charger Installation in the UK"}]},{"@type":"WebSite","@id":"https:\/\/catelecomuk.com\/blog\/#website","url":"https:\/\/catelecomuk.com\/blog\/","name":"catelecomuk","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/catelecomuk.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/catelecomuk.com\/blog\/wp-json\/wp\/v2\/pages\/292","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/catelecomuk.com\/blog\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/catelecomuk.com\/blog\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/catelecomuk.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/catelecomuk.com\/blog\/wp-json\/wp\/v2\/comments?post=292"}],"version-history":[{"count":0,"href":"https:\/\/catelecomuk.com\/blog\/wp-json\/wp\/v2\/pages\/292\/revisions"}],"wp:attachment":[{"href":"https:\/\/catelecomuk.com\/blog\/wp-json\/wp\/v2\/media?parent=292"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}